An O ( n log n ) algorithm for the two-machine ow shop problem with controllable machine speeds
| Year of publication: |
1995
|
|---|---|
| Authors: | Hoesel, C.P.M. van ; Wagelmans, A.P.M. ; Vliet, M. van |
| Institutions: | Maastricht : METEOR, Maastricht Research School of Economics of Technology and Organization |
| Subject: | operations research and management science |
-
The assembly of printed circuit boards : a case with multiple machines and multiple board types
Crama, Yves, (1995)
-
Approximating Preemptive Stochastic Scheduling
Nicole, Megow, (2009)
-
Simple optimality proofs for Least Recently Used in the presence of locality of reference
Benjamin, Hiller, (2009)
- More ...
-
An O ( T ³) algorithm for the economic lot-sizing problem with constant capacities
Hoesel, C.P.M. van, (1995)
-
Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems
Hoesel, C.P.M. van, (1997)
-
A branch-and-cut algorithm for the frequency assignment problem
Aardal, K.I., (1996)
- More ...