An O(n2) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines
Year of publication: |
2012
|
---|---|
Authors: | Panwalkar, S.S. ; Koulamas, Christos |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 221.2012, 1, p. 7-13
|
Publisher: |
Elsevier |
Subject: | Scheduling | Flow shop | Multi-criteria problems |
-
Flow shop scheduling with heterogeneous workers
Benavides, Alexander J., (2014)
-
Hadda, Hatem, (2015)
-
EXAMINATION OF SCHEDULING METHODS FOR PRODUCTION SYSTEMS
VARGA, ZOLTÁN, (2014)
- More ...
-
The two-machine no-wait general and proportionate open shop makespan problem
Panwalkar, S.S., (2014)
-
Panwalkar, S.S., (2012)
-
The three-stage ordered flow shop problem with flexible stage ordering
Panwalkar, S.S., (2013)
- More ...