//-->
Biogeography-based optimisation for flexible manufacturing system scheduling problem
Shahla Paslar, (2015)
A review of methods and algorithms for optimizing construction scheduling
Zhou, J., (2013)
Robust MILP formulations for the two-stage weighted vertex p-center problem
Duran-Mateluna, Cristian, (2023)
Online LPT algorithms for parallel machines scheduling with a single server
Su, Chunjie, (2013)
Research on development strategy of tourism industry in the Southern Sichuan Economic Zone
Li, Hongying, (2018)