Assembly shop scheduling
Year of publication: |
2008
|
---|---|
Authors: | Gourgand, Michel ; Grangeon, Nathalie ; Norre, Sylvie |
Published in: |
Resource-constrained project scheduling : models, algorithms, extensions and applications. - London : ISTE [u.a.], ISBN 978-1-84821-034-9. - 2008, p. 229-242
|
Subject: | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Konsumentenverhalten | Consumer behaviour | Produktionsplanung | Production planning | Produktionssteuerung | Production control | Theorie | Theory | Durchlaufzeit | Lead time |
-
Mozdgir, A., (2013)
-
Wang, Shasha, (2019)
-
Yang, Shengluo, (2021)
- More ...
-
Gourgand, Michel, (2005)
-
A contribution to the stochastic flow shop scheduling problem
Gourgand, Michel, (2003)
-
Meta-Heuristics for the Deterministic Hybrid Flow Shop-Problem
Gourgand, Michel, (2000)
- More ...