Balancing stochastic two-sided assembly lines
Year of publication: |
1-15 October 2016
|
---|---|
Authors: | Chiang, Wen-Chyuan ; Urban, Timothy L. ; Luo, Chunyong |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 54.2016, 19/20 (1/15.10.), p. 6232-6250
|
Subject: | manufacturing | two-sided assembly line | stochastic task time | particle swarm optimization | Fließfertigung | Assembly-line production | Algorithmus | Algorithm | Theorie | Theory | Produktionsplanung | Production planning |
-
Yuan, Biao, (2015)
-
Li, Zixiang, (2017)
-
Branch, bound and remember algorithm for two-sided assembly line balancing problem
Li, Zixiang, (2020)
- More ...
-
An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
Urban, Timothy L., (2006)
-
Incorporating Workflow Interference in Facility Layout Design: The Quartic Assignment Problem
Chiang, Wen-Chyuan, (2002)
-
The integrated machine allocation and layout problem
Urban, Timothy L., (2000)
- More ...