//-->
Implementing Kanbans within high variety/low volume manufacturing environments
Stockton, D.J., (1995)
Implementing kanbans within high variety-low volume manufacturing environments
Design of flexible manpower line walk cycles for a fixed number of operators
Stockton, D.J., (2005)