//-->
How to use cost benefit analysis in project appraisal
Frost, Michael John, (1975)
Cost benefit analysis : a case study on the new international airport
Kumtong, Chanet W., (1972)
What is wrong with Roskill?
Mishan, Edward Joshua, (1970)
A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs
Swoveland, Cary, (1975)
Evaluating Improvements in Electric Utility Reliability at British Columbia Hydro
Keeney, Ralph L., (1995)
A Deterministic Multi-Period Production Planning Model with Piecewise Concave Production and Holding-Backorder Costs