//-->
Bi-criteria scheduling problems: Number of tardy jobs and maximum weighted tardiness
Huo, Yumei, (2007)
Two machine scheduling subject to arbitrary machine availability constraint
Huo, Yumei, (2018)
Minimizing total completion time in two-machine flow shops with exact delays
Huo, Yumei, (2009)