A bicriteria approach to maximize the weighted number of just-in-time jobs and to minimize the total resource consumption cost in a two-machine flow-shop scheduling system
Year of publication: |
2012
|
---|---|
Authors: | Shabtay, Dvir ; Bensoussan, Yaron ; Kaspi, Moshe |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 136.2012, 1, p. 67-75
|
Saved in:
Saved in favorites
Similar items by person
-
Shabtay, Dvir, (2012)
-
Shabtay, Dvir, (2012)
-
Maximizing the weighted number of just-in-time jobs in several two-machine scheduling systems
Shabtay, Dvir, (2012)
- More ...