//-->
Optimal maintenance, repair, and replacement for Great Lakes marine diesels
Perakis, A. N., (1991)
Analysis and design of split and merge unpaced assembly systems by metamodelling and stochastic search
Bulgak, A.A., (2006)
Robust design of asynchronous flexible assembly systems
Bulgak, A.A., (1999)