Case study: Accelerated schedule for MULTI LIMS installation
This presentation focuses on the steps taken by the Westinghouse Hanford Company to meet an accelerated schedule for configuration and implementation of the MULTI LIMS in a multiple laboratory environment. The Westinghouse Hanford Company purchased the MULTI LIMS Laboratory Information Management System in August, 1993. Hardware delivery began in October, 1993. Less than four months later, the initial configuration was released for use in two Westinghouse Hanford Company laboratories. Several major obstacles were overcome during implementation. These include information gathering for base table loading, user training, acceptance of the new system by users of a legacy system, and hardware configuration issues. In summary, steps needed to be taken to meet the accelerated implementation schedule of the MULTI LIMS at the Hanford Site. The obstacles faced were overcome through the in-depth knowledge and help of the vendor and the dedication and drive of the technical staff.
Year of publication: |
2008-02-12
|
---|---|
Authors: | Ibsen, T.G. |
Subject: | management of radioactive and non-radioactive wastes from nuclear facilities | general and miscellaneous//mathematics, computing, and information science | TANKS | INFORMATION SYSTEMS | HANFORD RESERVATION | INSTALLATION | DATA BASE MANAGEMENT | TESTING |
Saved in:
freely available
Saved in favorites
Similar items by subject
-
Computer-based tools for decision support at the Hanford Site
Doctor, P.G., (2008)
-
Computer-based tools for decision support at the Hanford Site
Doctor, P.G., (2008)
-
Preliminary performance assessment strategy for single-shell tank waste disposal
Sonnichsen, J.C. Jr., (2008)
- More ...