Type of publication: Article
Language: English
Notes:
Cantarelli, Chantal, Molin, Eric J. E. and van Wee, Bert (2012) Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. Transport Policy, 22. pp. 49-56.
Other identifiers:
10.1016/j.tranpol.2012.04.001 [DOI]
Source:
BASE
Persistent link: https://www.econbiz.de/10011425573