Combined heuristics for bi-level group scheduling problems
Year of publication: |
1995
|
---|---|
Authors: | Logendran, Rasaratnam ; Mai, Luen ; Talkington, Diane |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 38.1995, 2-3, p. 133-145
|
Publisher: |
Elsevier |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Analysis of cellular and functional manufacturing systems in the presence of machine breakdown
Logendran, Rasaratnam, (1997)
-
Methodology for converting a functional manufacturing system into a cellular manufacturing system
Logendran, Rasaratnam, (1993)
-
Group scheduling in flexible flow shops
Logendran, Rasaratnam, (2005)
- More ...