Comparisons of bi-objective genetic algorithm for hybrid flowshop scheduling with sequence-dependent setup times
Year of publication: |
2012
|
---|---|
Authors: | Mousavi, S. M. ; Zandieh, M. ; Amiri, M. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 10 (15.5.), p. 2570-2591
|
Subject: | bi-objective hybrid flowshop scheduling | crowding distance | genetic algorithm | TOPSIS | weighted sum | Evolutionärer Algorithmus | Evolutionary algorithm | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Theorie | Theory | Algorithmus | Algorithm |
-
Kumar, Harendra, (2022)
-
An effective algorithm for flexible assembly job-shop scheduling with tight job constraints
Lin, Wenhui, (2022)
-
Muştu, Settar, (2021)
- More ...
-
Vahdani, Behnam, (2022)
-
Mousavi, S. M., (2018)
-
Mousavi, S.M., (2012)
- More ...