//-->
Target Costing Performance Based on Alternative Participation and Evaluation Methods: A Laboratory Experiment
Monden, Y., (1997)
A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
Aigbedo, H., (1996)
Toyota Production System (2nd edition)
Monden, Y., (1995)