CONTRIBUTIONS TO MULTI-AGENT SYSTEMS IMPLEMENTATION FOR PROJECT SCHEDULING
Increasing project complexity makes scheduling problems more difficult to solve and requires more versatile algorithms. Two different approaches for the project scheduling optimization could be considered: TCPSP (Time-Constrained Project Scheduling), and RCPSP (Resource-Constrained Project Scheduling). In this paper we study thepossibility to apply Multi-Agent Systems (MAS) for these scheduling problems regarding different fitness functions. Wesearch for strengths and weaknesses of MAS as a prerequisite study for a further implementation of the TCSP on a specific MAS platform.