//-->
Improving spare parts management for field services : a model and a case study for the repair kit problem
Saccani, Nicola, (2017)
Simulation model for closed loop repairable parts inventory system with service level performance measures
Kapoor, Rohit, (2016)
Managing nuclear spare parts inventories : a data driven methodology
Scala, Natalie M., (2014)
Single facility, multi-item lot sizing under just-in-time and "cyclic scheduling for improvement"
Ramani, S., (1992)
Generation of electricity using a pair of oxen
Natarajan, T.V., (1992)
Inventory replenishment policies for the case of decreasing trend in demand
Ramani, S., (1988)