Type of publication: Article
Language: English
Notes:
Cantarelli, Chantal, Molin, Eric J. E., van Wee, Bert and Flyvbjerg, Bent (2012) Different cost performance: Different determinants? The case of cost overruns in Dutch transport infrastructure projects. Transport Policy, 22. pp. 88-95.
Other identifiers:
10.1016/j.tranpol.2012.04.002 [DOI]
Source:
BASE
Persistent link: https://www.econbiz.de/10011425574