//-->
Storage space allocation in container terminals
Zhang, Chuqian, (2003)
Rubber tired gantry crane deployment for container yard operation
Linn, Richard, (2003)
Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
Zhang, Wei, (2005)