Effective material flow at an assembly facility
Year of publication: |
2010
|
---|---|
Authors: | Ellis, Kimberly ; Meller, Russell ; Wilck, Joseph ; Parikh, Pratik ; Marchand, Franky |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 48.2010, 23, p. 7195-7218
|
Saved in:
Saved in favorites
Similar items by person
-
Estimating picker blocking in wide-aisle order picking systems
Parikh, Pratik, (2009)
-
A note on worker blocking in narrow-aisle order picking systems when pick time is non-deterministic
Parikh, Pratik, (2010)
-
Effective material flow at an assembly facility
Ellis, Kimberly P., (2010)
- More ...