//-->
First-Time-Right procurement : substitution of the paradox purchasing savings through First-Time-Right Procurement (FTRP)
Münch, Oliver, (2015)
First-Time-Right Procurement : Substitution of the Paradox Purchasing Savings through First-Time-Right Procurement (FTRP)
Clock Time Versus Event Time : Temporal Culture or Self-Regulation?
Avnet, Tamar, (2011)
System dynamics in project management: A comparative analysis with traditional methods
Rodrigues, Alexandre, (1996)
Propriety of posterior in Bayesian space varying parameter models with normal data
Rodrigues, Alexandre, (2008)
A Class of Convolution-Based Models for Spatio-Temporal Processes with Non-Separable Covariance Structure
RODRIGUES, ALEXANDRE, (2010)