Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
| Year of publication: |
2014
|
|---|---|
| Authors: | Keshavarz, Taha ; Salmasi, Nasser |
| Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 8.2014, 3, p. 366-387
|
| Subject: | flowshop scheduling | group scheduling | sequence-dependent setup time | branch and price | lower bound | metaheuristics | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Theorie | Theory | Evolutionärer Algorithmus | Evolutionary algorithm | Mathematische Optimierung | Mathematical programming |
-
Hosseinzadeh, Mohammad Reza, (2022)
-
Samouei, Parvaneh, (2023)
-
Behjat, Saeed, (2017)
- More ...
-
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
Keshavarz, Taha, (2014)
-
Flowshop sequence-denpendent group scheduling with minimisation of weighted earliness and tardiness
Keshavarz, Taha, (2019)
-
Keshavarz, Taha, (2015)
- More ...