Electric Power System Planning with Explicit Stochastic Reserves Constraint
The problem of optimal planning of an electric power system is formulated as a cost minimizing mixed-integer mathematical program. The model emphasizes system reliability, requiring reserve generating capacity such that a Loss of Load Probability criterion of one day in ten years is met. Integer variables are used in the model to express system reliability explicitly as a constraint on the system model. Results are given for several plant outage rates and demand levels. The results show that the reliability and "rule-of-thumb" approaches to system reserve planning can yield substantially different optimal system costs and configurations.
Year of publication: |
1977
|
---|---|
Authors: | Scherer, Charles R. ; Joe, Leland |
Published in: |
Management Science. - Institute for Operations Research and the Management Sciences - INFORMS, ISSN 0025-1909. - Vol. 23.1977, 9, p. 978-985
|
Publisher: |
Institute for Operations Research and the Management Sciences - INFORMS |
Saved in:
Saved in favorites
Similar items by person
-
Estimating peak and off-peak marginal costs for an electric power system . an ex ante approach
Scherer, Charles R., (1976)
-
Estimating electric power system marginal costs
Scherer, Charles R., (1977)
-
Optimal Water Pricing with Cyclical Supply and Demand
Riley, John G., (1976)
- More ...