Engineering change order processing in ERP systems : an integrated reactive model
| Year of publication: |
2010
|
|---|---|
| Authors: | Saenz de Ugarte, Benoît ; Hajji, Adnène ; Pellerin, Robert ; Artiba, Abdelhakim |
| Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 4.2010, 4, p. 394-412
|
| Subject: | ERP-System | ERP system | Rechnerbetrieb | Computer operations | Simulation | Evolutionärer Algorithmus | Evolutionary algorithm | Arbeitswissenschaft | Human engineering |
-
Dynamic order promising: real-time ATP
Robinson, Anne G., (2007)
-
Tiacci, Lorenzo, (2024)
-
Special issue: real-time supply chain optimisation and execution
Zhao, Zhenying, (2007)
- More ...
-
Engineering change order processing in ERP systems : an integrated reactive model
Saenz de Ugarte, Benoît, (2010)
-
Introduction: Supply chain and production systems engineering and management
Pellerin, Robert, (2013)
-
Maintenance Strategies And Reliability Optimization.
Artiba, Abdelhakim, (2005)
- More ...