Engineering change order processing in ERP systems: an integrated reactive model
| Year of publication: |
2010
|
|---|---|
| Authors: | Ugarte, Benoit Saenz De ; Hajji, Adnene ; Pellerin, Robert ; Artiba, Abdelhakim |
| Published in: |
European Journal of Industrial Engineering. - Inderscience Enterprises Ltd, ISSN 1751-5254. - Vol. 4.2010, 4, p. 394-412
|
| Publisher: |
Inderscience Enterprises Ltd |
| Subject: | manufacturing execution systems | MES | enterprise resource planning | ERP | discrete event simulation | modelling | genetic algorithms | adaptive manufacturing | integration | engineering change orders | reactive models | manufacturing processes | SCM | supply chain management | unpredicted changes | decision making | real-time support | disturbing events | controlled environments | aerospace industry | optimisation |
-
Trivedi, Shantanu, (2018)
-
Koupaei, Mehrdad Nouri, (2017)
-
A survey on adoption factors of cloud-based enterprise systems and their differences in Iranian SMEs
Tarani, Darya, (2021)
- More ...
-
Genetic algorithms for planning and scheduling engineer-to-order production : a systematic review
Neumann, Anas, (2024)
-
Neumann, Anas, (2024)
-
A model for advanced planning systems dedicated to the Engineer-To-Order context
Neumann, Anas, (2022)
- More ...