Estimating motorist delay at two-lane highway work zones
Maintenance or construction activity on a two-lane highway often requires a lane closure. As these conditions dictate that vehicles in both directions of travel utilize the highway's single remaining lane, significant motorist delay typically results. This paper presents a queueing-based approach for estimating the average delay imposed on vehicles in each operating cycle. To accommodate the stochastic nature of work zone operations, the research has exploited standard methods such as Monte-Carlo simulation and approximate analysis techniques to formulate models for predicting percentile values of average cyclic delay. Comparison of average delay values estimated using the formulated "approximate techniques" with those generated through Monte-Carlo and microscopic simulation suggests that the proposed method is a reasonable means for estimating work zone impacts.
Year of publication: |
1994
|
---|---|
Authors: | Cassidy, Michael J. ; Son, YoungTae ; Rosowsky, David V. |
Published in: |
Transportation Research Part A: Policy and Practice. - Elsevier, ISSN 0965-8564. - Vol. 28.1994, 5, p. 433-444
|
Publisher: |
Elsevier |
Saved in:
Saved in favorites
Similar items by person
-
Long-term hurricane risk assessment and expected damage to residential structures
Huang, Zhigang, (2001)
-
Negative Binomial Regression of Electric Power Outages in Hurricanes
Liu, Haibin, (2005)
-
Structural Safety and Serviceability of Concrete Bridges Subject to Corrosion
Stewart, Mark G., (1998)
- More ...