Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling
Year of publication: |
2008
|
---|---|
Authors: | Zobolas, G.I. ; Tarantilis, C.D. ; Ioannou, G. |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 46.2008, 12, p. 3359-3386
|
Saved in:
Saved in favorites
Similar items by person
-
A hybrid evolutionary algorithm for the job shop scheduling problem
Zobolas, G.I., (2009)
-
A web-based decision support system for waste lube oils collection and recycling
Repoussis, P.P., (2009)
-
Solving the open vehicle routeing problem via a single parameter metaheuristic algorithm
Tarantilis, C.D., (2005)
- More ...