//-->
Fuzzy expert systems and challenge of new product pricing
Haji, Alireza, (2009)
The optimal policy for a sampling plan in continuous production in terms of the clearance number
Haji, Alireza, (2004)
The effect of inspection errors on the optimal batch size in reworkable production systems with scraps
Haji, Alireza, (2010)