A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times
Year of publication: |
2005
|
---|---|
Authors: | Nyen, P. L. M. van ; Bertrand, J. W. M. ; Ooijen, Henny van ; Vandaele, N. J. |
Published in: |
OR spectrum : quantitative approaches in management. - Berlin : Springer, ISSN 0171-6468, ZDB-ID 2073885-7. - Vol. 27.2005, 2/3, p. 399-434
|
Subject: | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Lagerhaltungsmodell | Inventory model | Produktionssystem | Manufacturing system | Performance-Messung | Performance measurement | Tourenplanung | Vehicle routing problem |
-
Divergent production scheduling with multi-process routes and common inventory
Luo, Hao, (2012)
-
Nyen, P. L. M. van, (2006)
-
Sana, Shib Sankar, (2012)
- More ...
-
Van Nyen, Pieter L. M., (2009)
-
Van Nyen, Pieter L. M., (2009)
-
Van Nyen, Pieter L. M., (2009)
- More ...