How to make project plans trustworthy : an investigation based on multi-criteria contractor selection
Year of publication: |
2023
|
---|---|
Authors: | Ying, Hao ; Zhang, Shanshan ; Zhao, Xiande ; Zhang, Min |
Subject: | Construction supply chain management | contractor selection | evaluation criteria | signaling theory | Lieferkette | Supply chain | Multikriterielle Entscheidungsanalyse | Multi-criteria analysis | Bauwirtschaft | Construction industry | Projektmanagement | Project management | Lieferantenbewertung | Supplier evaluation | AHP-Verfahren | AHP approach | Signalling | Theorie | Theory | Bewertung | Evaluation |
-
Pitchipoo, Pandian, (2012)
-
Proposal of a supplier evaluation and ranking method based on fuzzy AHP and fuzzy TOPSIS
Ulhoa, Túlio Fígaro, (2021)
-
Akhtar, Mohammad, (2021)
- More ...
-
The impact of blockchain technology on consumer behavior : a multimethod study
Wang, Honglu, (2021)
-
Supply chain collaboration for sustainability : a literature review and future research agenda
Chen, Lujie, (2017)
-
The impact of political ties on firm innovativeness : testing a mediation and moderation model
Wang, Zhiqiang, (2022)
- More ...