A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—A case study for solar cell industry
Year of publication: |
2013
|
---|---|
Authors: | Chen, Yin-Yann ; Cheng, Chen-Yang ; Wang, Li-Chih ; Chen, Tzu-Li |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 141.2013, 1, p. 66-78
|
Publisher: |
Elsevier |
Subject: | Hybrid flow shop scheduling | Particle swarm optimization | Solar cell industry |
-
Chen, Yin-yyann, (2013)
-
Cheng, Chen-yang, (2013)
-
Integrated quay crane and yard truck scheduling for unloading inbound containers
Kaveshgar, Narges, (2015)
- More ...
-
Cheng, Chen-Yang, (2013)
-
Chen, Yin-Yann, (2013)
-
Cheng, Chen-yang, (2013)
- More ...