Hybrid flowshop scheduling with family setup time and inconsistent family formation
Year of publication: |
2012
|
---|---|
Authors: | Luo, Hao ; Huang, George Q. ; Shi, Yuan ; Qu, Ting ; Zhang, Ying Feng |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 6 (15.3.), p. 1457-1475
|
Subject: | family setup time | hybrid flowshop scheduling | metaheuristic | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm | Familie | Family | Algorithmus | Algorithm |
-
Metaheuristic algorithms for the hybrid flowshop scheduling problem
Öztop, Hande, (2019)
-
Paredes-Astudillo, Yenny Alexandra, (2024)
-
Soares, Leonardo C. R., (2022)
- More ...
-
Hybrid flowshop scheduling with family setup time and inconsistent family formation
Luo, Hao, (2012)
-
Divergent production scheduling with multi-process routes and common inventory
Luo, Hao, (2012)
-
Divergent production scheduling with multi-process routes and common inventory
Luo, Hao, (2012)
- More ...