IFSJSP: A novel methodology for the Job-Shop Scheduling Problem based on intuitionistic fuzzy sets
Year of publication: |
2013
|
---|---|
Authors: | Zhang, Xiaoge ; Deng, Yong ; Chan, Felix T.S. ; Xu, Peida ; Mahadevan, Sankaran ; Hu, Yong |
Published in: |
International journal of production research : American Institute of Industrial Engineers ; Society of Manufacturing Engineers. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 1604776. - Vol. 51.2013, 17 (1.9.), p. 5100-5119
|
Saved in:
Saved in favorites
Similar items by person
-
IFSJSP : a novel methodology for the job-shop scheduling problem based on intuitionsistic fuzzy sets
Zhang, Xiaoge, (2013)
-
Parameter estimation based on interval-valued belief structures
Deng, Xinyang, (2015)
-
Zhang, Xiaoge, (2017)
- More ...