Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem
-
A time-expanded network design model for staff allocation in mail centres
Thorburn, Hamish, (2024)
-
Optimal workforce assignment to operations of a paced assembly line
Dolgui, Alexandre, (2018)
-
The destination-loader-door assignment problem for automated package sorting centers
Jarrah, Ahmad I., (2016)
- More ...
-
Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
Botta-Genoulaz, V., (2000)
-
Fondrevelle, J., (2008)
-
Fondrevelle, J., (2008)
- More ...