Implementation of lean manufacturing principles in a Colombian machine shop : layout redesign and theory of constrains
Year of publication: |
2014
|
---|---|
Authors: | Mejía, Gonzalo ; Ramírez, Diana Carolina |
Published in: |
Production systems and supply chain management in emerging countries: best practices : selected papers from the International Conference on Production Research (ICPR) ; [5th International Conference on Production Research (ICPR) Americas 2010 held on July 21 - 23 in Bogotá, Colombia]. - Berlin [u.a.] : Springer, ISBN 3-642-44520-9. - 2014, p. 257-273
|
Subject: | Bogota | Lean Production | Lean production | Scheduling-Verfahren | Scheduling problem | Fertigungsinsel | Cellular manufacturing | Kolumbien | Colombia |
-
Zee, Durk-Jouke van der, (2010)
-
Irani, Shahrukh A., (2020)
-
Self-reinforcing mechanisms for cellularisation : a longitudinal case study
Mohd Norzaimi Che Ani, (2016)
- More ...
-
Mejía, Gonzalo, (2023)
-
A constraint programming-based lower bounding procedure for the job shop scheduling problem
Yuraszeck, Francisco, (2025)
-
Yuraszeck, Francisco, (2025)
- More ...