Implementing Kanbans within high variety/low volume manufacturing environments
Year of publication: |
1995
|
---|---|
Authors: | Stockton, D.J. ; Lindley, R.J. |
Published in: |
International Journal of Operations & Production Management. - MCB UP Ltd, ISSN 1758-6593, ZDB-ID 2032083-8. - Vol. 15.1995, 7, p. 47-59
|
Publisher: |
MCB UP Ltd |
Subject: | Cell manufacturing | Continuous improvement | Just‐in‐time | Kanban | Materials management | Process control |
-
Comparative analysis of group scheduling heuristics in a flow shop cellular system
Leu, Bor‐Yuh, (1995)
-
Planning for Continual Improvement in a Just‐in‐Time Environment
Swenseth, Scott R., (1993)
-
The Development of a Kanban System: A Case Study
Singh, N., (1990)
- More ...
-
Implementing kanbans within high variety-low volume manufacturing environments
Stockton, D.J., (1995)
-
Batch production using process sequence cells
Stockton, D.J., (1998)
-
Design of flexible manpower line walk cycles for a fixed number of operators
Stockton, D.J., (2005)
- More ...