Increasing the efficiency and productivity in the production of low voltage switchboard using resource constrained project scheduling
Year of publication: |
2018
|
---|---|
Authors: | Tannady, Hendy ; Maimury, Yona |
Published in: |
Journal of industrial engineering and management : JIEM. - Terrassa : Universitat Politècnica de Catalunya (UPC), ISSN 2013-0953, ZDB-ID 2495074-9. - Vol. 11.2018, 1, p. 1-33
|
Subject: | resource-constrained project scheduling | made-to-order | ACTIM | ACTRES | TIMERES | assembly system | simulation | Projektmanagement | Project management | Theorie | Theory | Simulation | Scheduling-Verfahren | Scheduling problem | Produktivität | Productivity | Engpass | Bottleneck | Fließfertigung | Assembly-line production |
-
Tannady, Hendy, (2018)
-
Li, Haitao, (2015)
-
Shan, Siqing, (2017)
- More ...
-
Tannady, Hendy, (2018)
-
Service quality analysis of two of the largest retail chains with minimart concept in Indonesia
Tannady, Hendy, (2018)
-
Service quality analysis of two of the largest retail chains with minimart concept in Indonesia
Tannady, Hendy, (2018)
- More ...