//-->
Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop
Fredendall, L.D., (1995)
The stochastic single machine scheduling problem with earliness and tardiness costs
Soroush, H.M., (1994)
Application of hierarchical production planning in a multiproduct, multimachine environment
Qiu, M.M., (2001)