Integrated process planning and scheduling for job-shop manufacturing and temporary production networks
Year of publication: |
2011
|
---|---|
Authors: | Käschel, Joachim ; Häckel, Sascha ; Lemke, Sascha ; Keidel, Jan |
Published in: |
Supply chain and corporate environmental management : Festschrift for Knut Richter. - Hamburg : Kovač, ISBN 3-8300-5655-9. - 2011, p. 95-109
|
Subject: | PPS-System | Production planning and control system | Prozessmanagement | Business process management | Scheduling-Verfahren | Scheduling problem | Unternehmensnetzwerk | Business network | Mathematische Optimierung | Mathematical programming |
-
Produktionsplanung und -steuerung einer flexiblen Fertigung : ein prozeßorientierter Ansatz
Höck, Michael, (1998)
-
A Literature Review on Production Scheduling with the Drum-Buffer-Rope Technique
Tayalı, H. Alper, (2017)
-
A review of literature on Drum-Buffer-Rope, Buffer management and distribution
Blackstone, John H., (2010)
- More ...
-
Genetische Algorithmen für die Fertigungssteuerung mit Prozessvarianten
Käschel, Joachim, (2014)
-
Keidel, Jan, (2016)
-
Untersuchungen zu Kooperationen zwischen kleinen und mittleren Unternehmen in Südwestsachsen
Käschel, Joachim, (2007)
- More ...