Integrated production-transshipment control policy for a two-location unreliable manufacturing system
Year of publication: |
2022
|
---|---|
Authors: | Dhahri, Akrem ; Gharbi, Ali ; Ouhimmou, Mustapha |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 247.2022, p. 1-21
|
Subject: | Unreliable manufacturing system | Two-location facility | Feedback production planning | Lateral transshipment | Simulation | Stochastic dynamic programming | Produktionssystem | Manufacturing system | Dynamische Optimierung | Dynamic programming | Produktionsplanung | Production planning | Stochastischer Prozess | Stochastic process | Produktionssteuerung | Production control |
-
Dhahri, Akrem, (2022)
-
Bouslah, B., (2013)
-
Sethi, Suresh, (2020)
- More ...
-
Dhahri, Akrem, (2022)
-
Tactical supply chain planning for a forest biomass power plant under supply uncertainty
Shabani, Nazanin, (2014)
-
Lot sizing problem on a paper machine under a cyclic production approach
Bouchriha, Hanen, (2007)
- More ...