INTEGRATING SCHEDULING WITH BATCHING AND LOT-SIZING.
| Year of publication: |
1990
|
|---|---|
| Authors: | POTTS, C.N. ; VAN WASSENHOVE, L.N. |
| Institutions: | Econometrisch Instituut, Faculteit der Economische Wetenschappen |
| Subject: | econometrics | economic models | mathematics |
-
SPECIFICATION TESTS IN SIMULTANEOUS EQUATION SYSTEM.
DHRYMES, P.J., (1990)
-
Frenk, J.B.G., (1991)
-
Multiplicity, Degeneracy, and the Strong Complementary Slackness Theorem of Linear Programming.
Sierksma, G., (1993)
- More ...
-
SINGLE MACHINE SCHEDULING TO MANIMIZE TOTAL WEIGHTED LATE WORK.
HARIRI, A.M.A., (1990)
-
The Bounded Knapsack Problem with Setups
Sural, H., (1997)
-
Dynamic programming and decomposition approaches for the single machine total tardiness problem
Potts, C.N., (1987)
- More ...