Just-in-time parts feeding policies for paced assembly lines : possible solutions for highly constrained layouts
Year of publication: |
July 2016
|
---|---|
Authors: | Zammori, Francesco ; Braglia, Marcello ; Castellano, Davide |
Published in: |
International transactions in operational research : ITOR ; a journal of the International Federation of Operational Research Societies (IFORS). - Oxford : Wiley, ISSN 0969-6016, ZDB-ID 1213721-2. - Vol. 23.2016, 4, p. 691-724
|
Subject: | applied probability | facility layout | JIT feeding systems | material handling | paced assembly lines | vehicles routing | Just in Time | Just in time | Fließfertigung | Assembly-line production | Tourenplanung | Vehicle routing problem | Fabrikplanung | Facility layout | Scheduling-Verfahren | Scheduling problem |
-
Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
Emde, Simon, (2010)
-
Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines
Emde, Simon, (2010)
-
Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
Emde, Simon, (2012)
- More ...
-
Revised overall labour effectiveness
Braglia, Marcello, (2020)
-
Braglia, Marcello, (2018)
-
Uncertainty in value stream mapping analysis
Braglia, Marcello, (2009)
- More ...