Makespan and workstation utilization minimization in a flowshop with operations flexibility
Production environments where there are more tasks than workstations and any task can be assigned to any workstation are examples of operations flexibility. This paper investigates the benefits of operations flexibility in a flowshop when the goals are to minimize the makespan and workstation utilization. Furthermore, machine dominance principles are extended to the case of a flowshop with operations flexibility. The proposed heuristic framework comprises of two phases, allocation of operations to workstations and generation of job sequencing. In addition, an improvement procedure based on simulated annealing is implemented for this problem. The experimental results identify the effects of the experimental factors; show the significance of the heuristic factor; and demonstrate the tradeoff between the two performance criteria.
Year of publication: |
2011
|
---|---|
Authors: | Ruiz-Torres, Alex J. ; Ho, Johnny C. ; Ablanedo-Rosas, José H. |
Published in: |
Omega. - Elsevier, ISSN 0305-0483. - Vol. 39.2011, 3, p. 273-282
|
Publisher: |
Elsevier |
Keywords: | Scheduling Flowshop Makespan Workstation utilization Sum of machine completion times Operations flexibility |
Saved in:
Saved in favorites
Similar items by person
-
Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
Ruiz-Torres, Alex J., (2010)
-
Makespan and workstation utilization minimization in a flowshop with operations flexibility
Ruiz-Torres, Alex J., (2011)
-
Ruiz-Torres, Alex J., (2012)
- More ...