//-->
Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
Kadipasaoglu, S.N., (1995)
A study on the effect of the extent and location of protective capacity in flow systems
Kadipasaoglu, S.N., (2000)
A note on scheduling hybrid flow systems
Kadipasaoglu, S.N., (1997)