Minimising maximum tardiness in assembly flowshops with setup times
Year of publication: |
1-15 December 2017
|
---|---|
Authors: | Aydilek, Asiye ; Aydilek, Harun ; Allahverdi, Ali |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 24 (1/15.12.), p. 7541-7565
|
Subject: | scheduling | flow shop scheduling | simulated annealing | maximum tardiness | dominance relation | set-up time | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Fließfertigung | Assembly-line production | Evolutionärer Algorithmus | Evolutionary algorithm | Theorie | Theory | Branch-and-Bound | Branch and Bound |
-
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
Jeong, BongJoo, (2014)
-
Fernandez-Viagas, Victor, (2014)
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
- More ...
-
Aydilek, Asiye, (2013)
-
Aydilek, Asiye, (2013)
-
Allahverdi, Ali, (2014)
- More ...