//-->
A multistage graph-based procedure for solving a just-in-time flexible job-shop scheduling problem with machine and time-dependent processing costs
Corominas, Albert, (2019)
Makespan minimization for the m-machine ordered flow shop scheduling problem
Khatami, Mostafa, (2019)
Two-machine flow shop scheduling with deteriorating jobs : minimizing the weighted sum of makespan and total completion time
Cheng, Mingbao, (2015)
A note on "minimizing makespan in three machine flow shop with deteriorating jobs"
Jafari, Abbas-Ali, (2016)
Research on scheduling with job-dependent learning effect and convex resource-dependent processing times
Wang, Jo-Bo, (2015)
On the ERM formulation and a stochastic approximation algorithm of the stochastic- R0 EVLCP
Wang, Ming-zheng, (2014)