Minimizing makespan in three-machine flow shops with deteriorating jobs
Year of publication: |
2013
|
---|---|
Authors: | Wang, Jo-bo ; Wang, Ming-zheng |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 40.2013, 2, p. 547-557
|
Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Heuristik | Heuristics | Algorithmus | Algorithm |
-
An efficient iterated local search algorithm for the total tardiness blocking flow shop problem
Ribas, Imma, (2013)
-
Ozturk, Onur, (2012)
-
Subramanian, Anand, (2014)
- More ...
-
A note on "minimizing makespan in three machine flow shop with deteriorating jobs"
Jafari, Abbas-Ali, (2016)
-
Wang, Jo-Bo, (2015)
-
Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines
Sun, Lin-Hui, (2012)
- More ...