//-->
Optimal production planning in stochastic jobshops with long-run average cost
Presman, Ernst, (2000)
Operations research proceedings 1999 : selected papers of the Symposium on Operations Research (SOR '99), Magdeburg, September 1 - 3, 1999
Inderfurth, Karl, (2000)
Verfahren zur Berechnung unterer Schranken für Job Shop Scheduling Probleme mit stochastischen Vorrangbeziehungen
Lechleiter, Iris, (1998)
Three heuristic procedures for the stochastic, two-machine flow shop problem
Baker, Kenneth R., (2011)
Modeling activity times by the Parkinson distribution with a lognormal core : theory and validation
Trietsch, Dan, (2012)
PERT 21 : fitting PERT/CPM for use in the 21st century