Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time
| Year of publication: |
2011
|
|---|---|
| Authors: | Nekoiemehr, N. ; Moslehi, G. |
| Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0160-5682, ZDB-ID 716033-1. - Vol. 62.2011, 7, p. 1403-1412
|
| Subject: | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm | Fließfertigung | Assembly-line production | Theorie | Theory | Produktionsplanung | Production planning | Heuristik | Heuristics |
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
Nasrollahi, Vahid, (2022)
- More ...
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
Moslehi, G., (2009)
-
Kianfar, K., (2012)
- More ...