Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance
Year of publication: |
2014
|
---|---|
Authors: | Benmansour, Rachid ; Allaoui, Hamid ; Artiba, Abdelhakim ; Hanafi, Saïd |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 47.2014, p. 106-113
|
Subject: | Scheduling | Earliness | Tardiness | Maintenance | Due date | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Theorie | Theory | Branch-and-Bound | Branch and Bound | Algorithmus | Algorithm | Operations Research | Operations research | Dynamische Optimierung | Dynamic programming |
-
Penz, Louise, (2023)
-
Wang, Shijin, (2013)
-
Single-machine scheduling with job-dependent machine deterioration
Luo, Wenchang, (2019)
- More ...
-
Stochastic single machine scheduling with random common due rate
Benmansour, Rachid, (2012)
-
Nested general variable neighborhood search for the periodic maintenance problem
Todosijević, Raca, (2016)
-
Krim, Hanane, (2019)
- More ...