Minimizing total completion time on a single machine with step improving jobs
Year of publication: |
September 2015
|
---|---|
Authors: | Kim, Eun-Seok ; Oron, Daniel |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 716033-1. - Vol. 66.2015, 9, p. 1481-1490
|
Subject: | scheduling | step-improving processing times | total completion time | heuristic | Durchlaufzeit | Lead time | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Theorie | Theory | Terminplanung | Time scheduling | Produktionssteuerung | Production control |
-
Allahverdi, Ali, (2014)
-
Total completion time with markespan constraint in no-wait flowshops with setup times
Allahverdi, Ali, (2014)
-
Chen, Rubing, (2021)
- More ...
-
Multi-location production and delivery with job selection
Kim, Eun-seok, (2013)
-
Identifying and prioritizing delay factors in Iran’s oil construction projects
Kazemi, Aliyeh, (2020)
-
Parallel machine scheduling with s-precedence constraints
Kim, Eun-Seok, (2010)
- More ...